Things are starting to heat up at Savera Farms while the temperatures have finally started to decline. We are 3 days away from planting Melia Dubia and all of us have been busy with drip installation, manuring, and getting ready for planting our first batch of saplings. Due to a busy schedule especially on the infrastructure front like shadenet, water tank, drip etc, I have not been very regular on the blogging..
This post is on construction of Sub surface tank which essentially will be used for water storage. Three borewells will feed in the water and there will be one outlet that will irrigate approx. 30 acres via drip pipes. Due to a big acreage and moderately high water requirement, a tank was deemed essential. In addition, storage is essential especially in areas with regular power cuts.
My photo timestamps show that it took us 7 weeks to complete this. The dimensions are 40 ft x 40 ft x 5 ft and has a storage capacity of approx 2 lakh liters.
Below are some of the pictures of the tank construction and hopefully will give you a good idea on this engineering marvel!
JCB was able to dig the pit in approx 8 hours..
Constructing a solid foundation is imperative due to pressure exerted by underground water level during monsoons. We used a mix of cement, stones and sand.
Walls are erected..
Working on the partition walls..
Reinforcing the side walls with 'chicken mesh'. Cement was plastered over the mesh to give the structure more strength.
Plastering in process..
One of the three borewells is finally functioning.
Engineering marvel is finally up and functional!!
Next week, we will be attaching SST submersible pump to the drip setup. More details on drip in the coming weeks!