'Life line Express' comissioned..

After obtaining the EB connection in mid March, it was time to erect our 2 borewells with appropriate pumps. Water endurance testing was done for over 10 hours to ensure continuous water supply for a given depth and at the end of the exercise, we decided to erect the pump at 130 ft. If the water dries up in future, we can go lower by about another 50-70 ft (before we hit the end of casing pipes)

Getting the setup ready before the testing commenced.














Continuous monitoring of water yield was performed to ensure water potential was not depleting at a given depth.













We tested for over 10 hours and we were satisfied with 275 LPM (Litres per minute) yield.
It was ensured that the water flowing into the channel (as seen in the pic) did not go waste - with high moisture in the channel, we took up the task to deepen the channel for effective rain water management.







Borewell team poses with a Texmo 5 HP 8 stage submersible pump - model TRS 4508S













Borewell crew inserts the first 2" UPVC pipe. A total of 13 pipes were used.














'Liquid abundance'



















Economics:

Texmo 5 HP 8 stage submersible pump - model TRS 4508S - Rs 24164
2" UPVC Pipes (13 nos @ Rs 591 each)                             - Rs 7683
2" adaptor                                                                         - Rs 529
2" borewell clamp (heavy - 2nos @ Rs 529 each)                  - Rs 1058
Misc hardware (ropes, tape, bore cover, coupling)                 - Rs 1820

Total                                                                                 - Rs 35254 + 4% VAT

When taming the rain water runoff becomes essential!

Our farm is surrounded by water channels in the eastern and western directions. Over the years, due to excessive soil erosion and silting, the channels have come up to level of the land. Hence, instant flooding was a frequent occurrence on heavy showers.
So we decided to deepen one of the more problematic channels and we were delighted to see the results when it rained heavily a couple of weeks back.

One of the channels (bottom of the picture) which was dug deeper with a JCB












Channel was dug approx. 3 ft deep and 3 ft wide.






























Channel put to test  - we were happy to see the results.
After the water dried up, we noticed that the channel depth decreased by 6 to 8 inches. Channel deepening will be a continuous exercise, nonetheless we are glad to have tamed the rain water runoff for now!









Economics: 
One of the borewells is adjacent to the water channel and after having tested it for 10 hours, there was enough moisture in the channel to accomplish this exercise in the shortest time possible.
It took about 10 hours to deepen 200 m of channel tract. The expense incurred was close to Rs 6000.